Application |
Apply two coats of COPPER PAINT with a brush or roller. While the second coat still wet apply GREEN PATINA with a spray. |
Drying time |
COPPER PAINT : 1/2 hour between both coats. Dry about approx. 1 hour (drying time is longer in cold and wet weather).
GRREEN PATINA : 30-40 minutes. |
Pack size |
COPPER PAINT : 177ml for 3mē - 473ml for approx. 8 mē.
GREEN PATINA : 118ml for approx. 3mē - 473ml for 8mē. |
Thinning |
Ready to use. Do not thin.
Equipment cleaning : water |